Honda CR-V: Cooling System

Component Location Index

Honda CR-V. Cooling System

READ NEXT:

 Radiator Cap Test

1. Remove the radiator cap (A), wet the seal with engine coolant, then install it on the pressure tester (B) (commercially available). 2. Apply a pressure of 93-123 kPa (0.95-1.25 kgf/cm2, 14-18 psi)

 Water Passage Replacement

1. Drain the engine coolant. 2. Remove the alternator. 3. Remove the condenser fan shroud assembly. 4. Remove the A/C compressor without disconnecting the A/C hoses (see step 34). 5. Remove the in

 EGR Passage Removal and Installation

Removal 1. Drain the engine coolant. 2. Remove the air cleaner housing. 3. Remove the harness holder (A) from the bracket, then remove the harness holder bracket (B). 4. Remove the upper radiator h

SEE MORE:

 Boot Band Installation

Special Tools Required Boot band tool, KD-3191 or equivalent, commercially available Boot band pliers, Kent-Moore J-35910 or equivalent, commercially available Double Loop Type 1. Fit the boot ends onto the driveshaft and the inboard joint, then install the new double loop band (A) onto the boot. N

 Power Flow

P Position Hydraulic pressure is not applied to the clutch. Power is not transmitted to the countershaft. The countershaft is locked by the park pawl, interlocking the park gear. N Position Engine power transmitted from the torque converter drives the mainshaft idler gear, the idler shaft idler ge

© 2016-2025 Copyright www.hcrv.net