Honda CR-V: Dashboard

READ NEXT:

 Center Upper Dashboard Panel Removal/Installation

Special Tools Required KTC trim tool set SOJATP2014 * * Available through the American Honda Tool and Equipment Program; call 888-424-6857 NOTE: Put on gloves to protect your hands. Use the appropr

 Driver's Vent Panel Removal/Installation

Special Tools Required KTC trim tool set SOJATP2014 * * Available through the American Honda Tool and Equipment Program; call 888-424-6857 NOTE: Put on gloves to protect your hands. Use the appropr

 Passenger's Tray Removal/Installation

Special Tools Required KTC trim tool set SOJATP2014 * * Available through the American Honda Tool and Equipment Program; call 888-424-6857 SRS components are located in this area. Review the SRS compo

SEE MORE:

 Lock-up System

The lock-up mechanism of the torque converter clutch operates in D position (2nd, 3rd, 4th, and 5th), and in D position D3 driving mode (2nd and 3rd). The pressurized fluid is drained from the back of the torque converter through a fluid passage, causing the torque converter clutch piston to be he

 Boot Band Installation

Special Tools Required Boot band tool, KD-3191 or equivalent, commercially available Boot band pliers, Kent-Moore J-35910 or equivalent, commercially available Double Loop Type 1. Fit the boot ends onto the driveshaft and the inboard joint, then install the new double loop band (A) onto the boot. N

© 2016-2025 Copyright www.hcrv.net