Honda CR-V: Blower Unit Removal/Installation

1. Remove the glove box.

2. Disconnect the connector (A), then remove the connector clip (B), the wire harness clips (C), the bolts, and the glove box frame (D).

Honda CR-V. HVAC (Heating, Ventilation, and Air Conditioning)

3. Cut the plastic cross brace (A) in the glove box opening with diagonal cutters in the area shown.

Retain plastic cross brace to be reinstalled later.

Honda CR-V. HVAC (Heating, Ventilation, and Air Conditioning)

4. Remove the wire harness clips (A), the self-tapping screws, and the passenger's heater duct (B).

Honda CR-V. HVAC (Heating, Ventilation, and Air Conditioning)

5. Disconnect the connector (A) from the blower motor. Remove the wire harness clip (B).

Honda CR-V. HVAC (Heating, Ventilation, and Air Conditioning)

6. Disconnect the connector (A) from the recirculation control motor. Remove the self-tapping screws, the bolt, the mounting nuts, and the blower unit (B).

Honda CR-V. HVAC (Heating, Ventilation, and Air Conditioning)

7. Install the unit in the reverse order of removal.

Make sure that there is no air leakage.

Blower Unit Component Replacement

Note these items when overhauling the blower unit:

Honda CR-V. HVAC (Heating, Ventilation, and Air Conditioning)

READ NEXT:

 Evaporator Core Replacement

1. Recover the refrigerant with a recovery/recycling/ charging station. 2. Remove the bolt from the A/C line clamp, and remove the receiver line (A) from the clips (B). 3. Remove the nut, then disco

 Heater Unit/Core Replacement

SRS components are located in this area. Review the SRS component locations, and the precautions and procedures before doing repairs or service. 1. Make sure you have anti-theft codes for the audio sy

 A/C Compressor Replacement

NOTE: Do not install an A/C compressor into a system unless you are completely sure that the system is free of contamination. Installing the A/C compressor into a contaminated system can result in pre

SEE MORE:

 DTC P0010: VTC Oil Control Solenoid Valve Malfunction

NOTE: Before you troubleshoot, record all freeze data and any on-board snapshot, and review the general troubleshooting information. 1. Turn the ignition switch ON (II). 2. Clear the DTC with the HDS. 3. Start the engine. Hold the engine speed at 3,000 rpm without load (in Park or neutral) until

 Cam Chain Installation

NOTE: Keep the cam chain away from magnetic fields. Before this procedure, check that the variable valve timing control (VTC) actuator is locked by turning the VTC actuator counterclockwise. If not locked, turn the VTC actuator clockwise until it stops, then recheck it. If it is still not loc

© 2016-2025 Copyright www.hcrv.net